York & George

York & George

A specific project combining works at the level of historic class buildings with modernity. The building up to the 6th floor has historic parts that are supervised by the conservator of monuments, and from level 7 it is a modern building with 199 apartments.
In the historic part, we completed all of the preparatory and renovation works. The internal part of the work included the restoration of the original state on the wall elements that will remain visible for the rest of their existence. All painting finishes were completed via brush application as the heritage specification instructed for the building.
Residential work will be carried out in accordance with current standards The MBS team is conducting a painted renovation on 199 units. The team will check for any defects and will apply a combination of painting and texture coatings, to enhance each units appearance.

Read more
Waterloo 25 Allen St

Waterloo 25 Allen St

A complex of residential buildings located in the quieter part of Waterloo.
Renovation work consisting of:
– Elimination of all types of ubiquitous connections in walls
– Tile change in sensitive locations
– Assembly of non-slip thresholds
– Waterproofing on the covered part of the balconies
– Waterproofing in the place of tiles change
– Concrete cancer
– Supplementing poverty renditions
– Exchange of ceilings on balconies
– Painting

Read more
Bondi 22 Wellington St

Bondi 22 Wellington St

A new building complex requiring painting with the three-layer DULUX system and waterproofing with the four-layer ARDEX system

Read more
Five Dock

Five Dock

The building consists of 20 two-level apartments and 4 commercial rooms with two levels of underground car parks. Typical construction and renovation work was carried out on the building because of the condition the building has been left for 5 years. The building was cleaned of all the remains of the previous contractors, including scaffolds, garbage, and unused materials.
The Scope of Works included:
– Disturbance of all sewage systems including replacement of necessary elements and commissioning of the entire system with connection to municipal sewage
– Replacement of the entire electrical installation with substation
– Replacement of pumps and water system in the retention tank
– Replacement of the roof structure and ceramic tile
– Replacing the damaged rend and supplementing the users
– Replacement of all windows
– Tiled
– Montage doors, stairs and hand reels
– Installation of alarm and fire alarm installations
– Montage of roofing on the inner courtyard of the building
– Waterproofing
– Installation of a gas system

Read more
Heritage Central Station

Heritage Central Station

The works concerned only and exclusively the historic part of the ceiling of the central station.
The Project consisted of two stages:
– The first involved a typically historic ceiling in the part of the station hall which was renovated to the same look as it had at the time of construction. 450m2 had to be cleaned, checked, repaired, preserved and repainted in accordance with the requirements of the conservator.
– The second part of the work was cleaning, renewing, preserving and painting the ceiling at the main hall of the station.

Read more
Hotel Bondi

Hotel Bondi

It is one of the oldest buildings on Bondi Beach. The painting and renovation works were carried out with the direct supervision of the conservator of monuments. The scope of works included the renovation of the entire facade of the building throughout its entire area and repainting to match the existing colour.
The Scope of Works consisted of:
– Supplementing ubiquity on the walls
– Eliminating cracks and any inferiors on the walls
– Replacement of wooden parts not suitable for repair
– Painting

Read more